1. Unboxing and Getting to Know the Equipment

1.1 주요 기술 사양

LISUN 모델 

YWX/Q-150

YWX / Q-250

YWX/Q-750

YWX/Q-010

YWX/Q-016

YWX/Q-020

Studio Dimensions  

600 × 450 × 400 

900 × 600 × 500 

1100 × 750 × 500 

1200 × 800 × 500 

1600 × 1000 × 600 

2000 × 1000 × 600 

외부 상자 치수 

1100 × 670 × 1050 

1410 × 900 × 1050 

1600 × 1050 × 1200 

1700 × 1150 × 1200 

2300 × 1250 × 1450 

2800 × 1350 × 1450 

Laboratory Volume 

108L 

270L

412L

480 L

960L

1200 L 

염수탱크 용량 

15 L 

25 L 

30L 

32L 

40L 

45L 

전원 공급 장치

Single-phase AC 220 V/50 Hz (60 Hz available upon request)

Three-phase AC 380 V/50 Hz (60 Hz available upon request)

1.5kW 

2.0kW 

3.5kW 

3.5kW 

5.0kW 

6.0kW 

Space for displaying samples  

500 × 300 × 250 

800 × 450 × 250 

900 × 600 × 300 

1000 × 600 × 300 

1400 × 800 × 350 

1800 × 800 × 350 

How to Open the Lid 

Manual 

Manual 

Manual 

스테인리스 스틸 가스 스프링

실린더

실린더

분무 방법 

Continuous, Intermittent, and Programmable Testing 

시험 종류 

Neutral Test (NSS), Acid Test (AASS), Copper-Accelerated Salt Spray Test (CASS) 

샘플 랙 

One set each of V-grooves and O-shaped rods (combined to form an angle of 20° ± 5°); customization available for special samples; load capacity configured based on actual conditions 

1.2 개봉 및 내용물 확인

1.2.1 포장 해제 및 육안 검사

When unpacking the equipment, handle it gently to avoid any impact on the main unit. After unpacking, first inspect the equipment housing, the glass door of the mist chamber, the touchscreen, and other components for any damage, deformation, or scratches.

Check all equipment connections (power connection, air intake, exhaust, drain, etc.) to ensure they are in good condition and free of looseness, blockages, or damage.

If you discover that the equipment or accessories are damaged or deformed, 전원을 켜지 마세요; 연락하다 LISUN 고객 서비스 담당자가 즉시 응대합니다.

1.2.2 Host-type

1 Salt Spray Test Machine unit.

1 air compressor. Note: This can be purchased from LISUN or procured independently. If procuring independently, refer to the following specifications: air tank capacity 55 L; air flow rate 0.6 m³/min; maximum pressure: 0.8 MPa. The air compressor must be equipped with an oil-water separator to prevent oil and moisture in the compressed air from entering the equipment’s air lines, which could cause nozzle clogging or component corrosion.

1.2.3 소모품 및 액세서리

① Graduated cylinder; ② Sample rack, V-notch, and O-shaped rod; ③ Test salt: analytically pure sodium chloride, 500 g × 2; once used up, you may purchase more on your own or contact LISUN Customer Service; ④ Spare quartz glass nozzle.

Salt Spray Test Machine-Figure1
그림 1

Download links for the digital user manual, warranty card, and other documents have been sent to you via email. Please download them as soon as possible. If you missed the email, please feel free to contact us to request the download links again.

1.3 장비 구조 설명

1.3.1 Front View of the Test Chamber

① Touchscreen; ② USB port, used to export test curves; ③ Power switch; ④ Spray pressure regulating valve and spray pressure gauge; ⑤ Test chamber lid; ⑥ Small graduated cylinders, connected to the mist collector inside the test chamber; the number of small graduated cylinders depends on the size of the test chamber.

Salt Spray Test Machine-Figure2
그림 2

If your test chamber uses a pneumatic cylinder to open the lid, there will be a handle to control the opening and closing of the lid, as shown in the figure below:

Salt Spray Test Machine-Figure3
그림 3

1.3.2 Sides and Back of the Test Chamber

① Electrical cabinet cover—can be opened for maintenance in the event of a malfunction; ② Brine tank; ③ Manual water inlet for the saturation tank (pressure tank);④ Air compressor connection and inlet pressure regulator (if your test chamber uses a pneumatic cylinder for opening the lid, there will be two pressure regulators); ⑤ Power cord; ⑥ Automatic water refill port, used to automatically refill the test chamber and the saturation tank; ⑦ Mist exhaust port; ⑧ Drain pipe.

Salt Spray Test Machine-Figure4
그림 4

1.3.3 Inside the Test Chamber (Fog Chamber)

① Brine level control device; ② Spray tower and nozzles; the number of spray towers and nozzles depends on the size of the test chamber; ③ Brine hose and saturated tank hose; these hoses contain filters that require cleaning over time; ④ Brine tank drain valve; the tank must be drained if the equipment is not used for an extended period;⑤ Demister air inlet; compressed air from the air compressor enters the test chamber through this inlet during the demisting process; ⑥ Automatic water replenishment hose for the test chamber; this must be submerged in the water at the bottom of the test chamber; ⑦ Temperature control probe; ⑧ Condensate collector; used to measure salt spray deposition; the number of condensate collectors depends on the size of the test chamber.

Salt Spray Test Machine-Figure5
그림 5

Note: If your test chamber uses a pneumatic cylinder to open the lid, you must turn on the power and the air compressor and use the cylinder to open the lid before you can see inside the test chamber.

2. 안전상의 주의

2.1 전기 안전

2.1.1 전원 연결

소형 모델(YWX/Q-150, YWX/Q-250): 220 V single-phase power, 2.0 kW power rating; requires a single 1.5 mm² wire;

Medium-sized models (YWX/Q-750, YWX/Q-010): 220 V single-phase power, 3.5 kW power rating; requires a single 2.5 mm² wire;

대형 모델(YWX/Q-016, YWX/Q-020): 380V, three-phase, five-wire system; power rating greater than 5 kW; wire size must be 2.5 mm² per conductor.

전원 콘센트는 안전 기준을 준수하고 적절한 접지를 제공해야 하며, 기기의 정격 전류와 일치하는 정격 전류를 가져야 합니다(전용 회로 차단기를 설치하는 것이 좋습니다).

2.1.2 접지 사양

Grounding must be performed in accordance with the three-level grounding standards, with a grounding resistance of ≤50 Ω. A dedicated grounding wire (with a cross-sectional area of at least 2.5 mm²) must be used to connect to the ground.

It is strictly prohibited to connect a ground wire to gas pipes, non-metallic water pipes, heating pipes, or other flammable or explosive facilities to avoid the risk of electric shock or fire.

2.1.3 Contraindications for the Procedure

Before wiring, servicing, or replacing parts on the equipment, you must disconnect the power supply before proceeding.

Do not touch the power connector, touchscreen, or other electrical components with wet hands. Keep the area around the device free of standing water to prevent electric shock.

If any abnormalities occur while the equipment is running—such as electrical leakage, unusual noises, or smoke—immediately disconnect the power supply and contact a professional for repairs. Do not attempt to disassemble the equipment yourself.

2.2 작동 안전

2.2.1 Test Specimen Requirements

This device is intended only for testing non-flammable, non-explosive, and non-radioactive solid or flexible materials (such as metal coatings, plastic parts, and electronic component housings).

If the sample contains volatile components (such as organic solvents or corrosive gases), you must consult the equipment compatibility instructions in advance or conduct a small-scale preliminary test to confirm that there are no safety risks (such as corrosion of equipment components or the generation of toxic gases); otherwise, the sample must not be placed in the equipment.

2.2.2 Properly Connect the Exhaust Pipe

Salt spray is corrosive; the exhaust pipe must be connected to the outdoors or a dedicated sewer system. It must not be discharged indoors or connected to a standard sewer system.

The mist exhaust pipe must remain unobstructed, free of kinks or blockages, and must not include a P-trap; otherwise, salt spray condensate will accumulate inside the pipe, blocking the exhaust passage and affecting test results and equipment safety. See the diagram below:

Salt Spray Test Machine-Figure6
그림 6

2.2.3 금지된 행위

While the equipment is in operation, non-professionals are prohibited from disassembling or repairing it. In the event of a malfunction, contact after-sales service personnel or follow the instructions of a technician.

If the equipment triggers an alarm, immediately stop the test and troubleshoot the problem (see “Chapter 6: Troubleshooting and Resolution of Common Problems”). Do not force the equipment to restart; operating the equipment before the problem is resolved may cause further damage.

Do not open the test chamber lid until the test is complete and the defogging process is finished, to prevent direct contact between the salt spray and human skin.

Do not disassemble core components such as nozzles, temperature probes, heating elements, and liquid level sensors without authorization. Do not modify the equipment’s electrical, pneumatic, or structural systems. Failure to comply will void the warranty and may result in safety incidents.

2.3 환경 안전

2.3.1 설치 요구 사항

주변 온도: 5~25°C. 지나치게 높은 온도는 시험 챔버의 온도 제어 안정성에 영향을 미칠 수 있으며, 지나치게 낮은 온도는 가열 효율에 영향을 미칠 수 있으므로 피해야 합니다.

상대 습도: 85% RH 이하. 습기로 인한 장비 전기 부품의 단락을 방지하기 위해 주변 환경은 건조해야 합니다.

Other Requirements: No direct sunlight (to prevent temperature fluctuations in the salt spray chamber); no strong electromagnetic fields (such as those from Voltage Transformers or large electric motors, to avoid interfering with the control system); no strong air currents (such as direct airflow from air conditioning vents, which can affect salt spray distribution); atmospheric pressure range: 86–106 kPa.

2.3.2 공간 요구 사항

The equipment must be placed on a level surface; use a level to ensure the unit is stable (tilting can cause uneven salt spray distribution and liquid leaks).

Allow sufficient space around the equipment: ≥1500 mm on the left, right, and rear sides (to facilitate piping and cabling connections, liquid refills, and maintenance), and ≥2000 mm in front (to allow for opening the control panel door and operating the touchscreen).

2.4 기타

본 설명서에 나와 있지 않은 사항에 대해서는 주의를 기울여 진행하시거나 당사에 문의해 주십시오.

3. Preparations Before Operation

3.1 Cable Duct Connections

3.1.1 Power Cord Connection

2.1를 참조하십시오.

3.1.2 Exhaust Pipe Connection

Use the exhaust hose provided by LISUN. If you are supplying your own exhaust hose, please use a flexible hose with an inner diameter of 50 millimeters and connect it as described in Section 2.2.2.

3.1.3 Drain Pipe Connections

Use a non-metallic pipe with an inner diameter of 20 mm (such as a PPR pipe); connect one end to the drain outlet on the back of the unit and the other end to the sewer line. The pipe must be installed at an angle to ensure smooth drainage.

3.1.4 Connecting the Automatic Water Inlet

The automatic water refill port automatically refills the saturation tank and test chamber during the test. You must provide your own piping and other accessories, and ensure that the water supply pressure is ≥0.1 MPa. If the port is not connected, you can refill the tank manually without affecting the operation of the equipment.

3.1.5 Air Compressor Connection and Inlet Pressure Adjustment

Use an 8-mm-diameter air hose, connecting one end to the air compressor’s outlet and the other end to the air inlet on the back of the device. Adjust the knob shown in the figure below to set the air pressure to 0.2 MPa for spraying.

Salt Spray Test Machine-Figure7
그림 7

If your salt spray chamber uses a pneumatic cylinder to open the lid, there will be two pressure regulators, as shown in the figure below: ① The first one supplies air to the cylinder and should be set to 0.4 MPa. ② The second one is for the spray and should be set to 0.2 MPa.

Salt Spray Test Machine-Figure8
그림 8

After making adjustments, monitor the system and ensure that the air pressure remains stable; unstable air pressure can affect the spraying performance.

3.2 Checking the Test Chamber Status

3.2.1 시험 챔버 청소

During transportation, debris or dust may inevitably enter the test chamber. Before using the unit for the first time, please clean the interior of the test chamber and the brine tank with clean water. Once everything has been thoroughly cleaned and the cleaning water has been drained, ensure that the equipment’s drain valve and the drain valve on the brine tank inside the test chamber are both closed.

3.2.2 Turn on the test chamber and check the water level in the water supply.

For information on touchscreen operation and functions, please refer to Chapter 4. When adding water to the water source, be sure to check the water level. Upon startup, the test chamber may trigger a low-water alarm; this alarm will clear once the water source is fully filled.

3.3 Adding Water

3.3.1 Filling the Test Chamber (Fog Chamber) with Water

Open the test chamber door on the front of the unit (for small units, open the lid manually; for large units, operate the lever to activate the cylinder and open the lid automatically). Pour purified water directly into the bottom of the test chamber until the float-type level sensor rises, and the “Laboratory” water level indicator bar on the touchscreen no longer displays the red “L” low-water alarm.

Salt Spray Test Machine-Figure9
그림 9

The bottom of the test chamber is equipped with an overflow outlet. If too much water is added, the excess water will drain out through the overflow outlet. The overflow outlet shares the same outlet as the drain pipe, but it is not controlled by the drain pipe valve.

If you have connected purified water to the “automatic water refill port,” the system will automatically refill the test chamber when water levels are low after the equipment is turned on or during testing.

3.3.2 Manual Water Addition to the Saturation Tank

Open the red valve at the manual fill port of the saturation tank and pour in purified water directly (do not use tap water or bottled water to prevent scale buildup). Observe the “Saturation Tank” water level indicator on the touchscreen; it will change from an “L” low-water alert to an “H” low-water alert, and then the low-water alert will disappear. When the “Saturation Tank” displays an “H” low-water level, it can still support 2–3 days of continuous testing; when the “Saturation Tank” displays an “L” low-water level, testing will be temporarily suspended, and water must be replenished immediately.

Salt Spray Test Machine-Figure10
그림 10

After manually adding water, be sure to close the valve; otherwise, high-pressure water will spray out during the test.

If you have connected purified water to the “automatic refill port,” the system will automatically refill the saturated tank when it runs low on water after startup or during testing.

3.3.3 Filling the Sealing Trough with Water

A sealing water trough is installed around the perimeter of the test chamber lid. Fill the trough with clean water to a level 2–3 cm above the bottom of the trough to ensure that the test chamber remains airtight once the lid is closed, preventing salt spray from leaking through gaps in the lid during the test.

Salt Spray Test Machine-Figure11
그림 11

3.4 Preparation and Injection of Saline Solution

3.4.1 Selection and Preparation of Salt Solution Concentration

In accordance with the test standard requirements, select the appropriate salt spray type and prepare the solution. Common types are as follows:

Types of Salt Spray

적용 기준

준비 방법

중요 사항

중성염수 분무(NSS)

GB/T 10125, ISO 9227

500 g analytical-grade sodium chloride + 9500 mL purified water; stir until the sodium chloride is completely dissolved, resulting in a 5% solution

Sodium chloride must be completely dissolved, with no sediment; purified water must meet the Grade 1 water standard specified in GB/T 6682.

Acid Salt Spray (AASS)

GB/T 10125, ISO 9227

Slowly add glacial acetic acid to the NSS solution, and use a pH meter (or pH paper with an accuracy of 0.1) to adjust the pH to 3.0–3.1.

Glacial acetic acid is corrosive; gloves and safety goggles must be worn, and it should be added drop by drop to prevent splashing.

구리 가속 염수 분무 시험(CASS)

GB/T 10125, ISO 9227

Add 0.26 g/L of anhydrous copper(II) chloride to the NSS solution; stir until dissolved, then heat to approximately 50°C to remove carbon dioxide from the solution; after cooling, adjust the pH to 3.0–3.1.

Copper chloride must be weighed accurately; when heating, take care to prevent the solution from boiling over.

3.4.2 Brine Injection

Open the fill port on the brine tank and slowly pour the prepared brine into the tank, taking care to avoid splashing the solution, which could corrode the equipment’s surface.

Salt Spray Test Machine-Figure12
그림 12

Monitor the water level in the “brine tank” on the touchscreen. When the “L” low-water indicator disappears, it indicates that the brine has reached the minimum operating level; however, if a long-term test is required (e.g., longer than 24 hours), you may continue to fill the brine tank until it is full (without exceeding the overflow level) to reduce the number of times you need to top off the brine during the test. Approximately 12 liters of brine is sufficient to power one spray tower for 24 hours of continuous spraying.

3.5 시료 준비 및 로딩

3.5.1 Sample Cleaning

Before testing, clean the sample surface to remove contaminants such as oil, dust, and fingerprints: Gently wipe the surface with a lint-free cotton swab dipped in anhydrous ethanol, or rinse with purified water and let it air dry. Avoid excessive wiping, which could damage the sample’s surface coating (such as electroplated or painted layers).

If there is a temporary protective coating on the sample surface (such as a protective film or rust-preventive paper), it must be completely removed to ensure that the sample surface comes into full contact with the salt spray.

3.5.2 Edge Protection

If the sample has cut edges, drilled holes, or marked areas (non-test areas), they must be sealed with high-temperature-resistant, salt-spray-resistant paint or tape to prevent galvanic corrosion in these areas, which could affect the accuracy of the test results.

It must be confirmed in advance that the sealing material does not react with the salt spray solution and will not contaminate the sample test area.

3.5.3 Holder Selection and Sample Placement

Choosing a Holder: Select a holder based on the sample’s size and shape—small samples can be suspended using round or triangular holders, while large or flat samples can be placed directly on the yellow mesh partition at the bottom of the mist chamber.

Salt Spray Test Machine-Figure13
그림 13

디스플레이 요구 사항:

Standard metal plate specimens must be placed at an angle of 15–25° (the angle can be adjusted using a stand) so that the test surface of the specimen is parallel to the direction of the salt spray flow, ensuring uniform coverage by the salt spray;

Sufficient distance must be maintained between samples (at least 1.5 times the largest dimension of the sample) to prevent the samples from coming into contact with one another or obstructing the salt spray, and condensation from the salt spray on one sample must not drip onto another sample;

The total volume of the sample must not exceed 3/5 of the chamber volume to avoid disrupting airflow circulation within the chamber, which could result in uneven temperature and salt spray distribution.

Except for the partitions and sample holders, the samples do not come into contact with any other components inside the test chamber.

3.6 Spray Pressure Adjustment

For instructions on using the touchscreen, refer to Chapter 4.

Close the test chamber lid. Go to the “Operation Settings” screen on the touchscreen, temporarily set the “Spray When Temperature Is Reached” function to “Off,” return to the main screen, and click “Run” to start the spray.

Adjust the spray pressure regulating valve on the front of the unit so that the front pressure gauge reads 1 kg/cm² (0.1 MPa), then observe the spray pattern from the nozzles inside the spray chamber: the spray should form a fine, uniform mist with no water droplets or interruptions, and the spray tower (if present) should cover the entire spray chamber.

After pre-spraying for 5 to 10 minutes, verify that the spray is uniform, with no water droplets and no interruptions in the spray.

4. Test Procedure (Key Touchscreen Operations)

4.1 Operation Settings

Go to the “Operation Settings” screen:

Salt Spray Test Machine-Figure14
그림 14
Salt Spray Test Machine-Figure15
그림 15

내용

내용 설명

① Startup Method

Configure power-on operations following a power outage.

Stop: An operation that restores the system to the “Stop” state when power is restored after a power outage during operation.

Hot Start: An operation that restores the system to the state it was in before the power outage when power is restored after a power outage during operation.

② Over-Temperature Protection

You can set the over-temperature alarm thresholds for the test chamber and the saturation tank; an alarm is triggered when the temperature exceeds these set values.

③ Warm mist

For the temperature-controlled spray function, select “On” or “Off.” When enabled, the unit will only activate the spray and start the timer when both the test chamber and the saturation tank reach a temperature within ±2 of the set value (this value can be adjusted; the factory default is ±2°C).

④ End Defogging

After setting the defogging time, turn on the defogging switch. The defogging process will start automatically once the test is complete and will end automatically when the set defogging time has elapsed. “0.02” represents 2 minutes; you can adjust the defogging time automatically based on the size of the test chamber.

Salt Spray Test Machine-Figure16
그림 16

내용

내용 설명

① Language Selection

You can choose between Chinese and English.

② Lock button

When the lock is set to “On,” none of the parameter settings are available.

③ Backlight Duration

Screen Saver Time Settings: Setting this to 0 disables the screen saver. Please use a screen saver whenever possible to extend the life of the LCD backlight.

④ Touchscreen Calibration

If the touchscreen tap location does not match the actual location, you can perform a calibration using the touchscreen calibration function. If calibration is required, please contact LISUN.

4.2 Calibration Test (FIX)

4.2.1 Introduction to the Calibration Test Screen

Fixed-value testing is suitable for tests conducted at a single temperature and with a single spray mode (such as conventional neutral salt spray testing).

Salt Spray Test Machine-Figure17
그림 17
Salt Spray Test Machine-Figure18
그림 18

내용

주의 사항

① Test Chamber Temperature

Displays the current test temperature and the current test temperature setpoint. The default setting is 35°C (the standard test temperature for NSS/AASS). If a different temperature is required, it can be entered using the touchpad (the range is typically 10–60°C).

② Saturated drum temperature

Displays the current saturation temperature and the current saturation temperature setpoint. The default setting is 47°C (to ensure saturated air humidity and prevent cooling due to spray); this value must be 10–15°C higher than the test chamber temperature.

③ Operating Time

The elapsed time of the current test. If “Spray When Temperature Is Reached” is selected in “Operation Settings,” the elapsed time will not be recorded and will be displayed as 0 until the target temperature is reached.

④ Water Level Display

Water level display for the laboratory (test chamber), saturation tank, and brine tank.

⑤ Manual Defogging

Press this button to activate the defrost function. This is consistent with the “End Auto Defrost” setting in the operation menu.

⑥ Run button

Click to run the calibration test; click again to stop or pause the calibration test.

⑦ Fixed-Value Settings

Set the parameters for this fixed-value test.

⑧Curve

Click to view or export historical test curves.

⑨ Spray and Defogging Status Display

Displays the current spray and defogging statuses.

4.2.2 Setting Parameters for Calibration Tests

To access the parameter settings screen:

Salt Spray Test Machine-Figure19
그림 19

내용

주의 사항

① Timer Duration

Set the duration of this test, typically as a multiple of 24 hours (e.g., 24h, 48h, 72h). If set to 0, you must click the Stop button to end the test.

② Spray Mode

Continuous: Sprays continuously for the set duration; “Continuous” is typically selected for NSS testing;

Cycle: Allows you to set spray and pause intervals, which alternate in a loop until the set duration is reached;

Off: No spraying.

③ Spray duration and pause duration

If the spray mode is set to “Cycle,” this setting must be configured.

4.3 Program Testing (PROGRAM)

4.3.1 Introduction to the Program Test Screen

The program test is suitable for cyclic testing involving multiple temperature ranges and multiple spray modes (such as salt spray testing that simulates diurnal temperature fluctuations).

Salt Spray Test Machine-Figure20
그림 20
Salt Spray Test Machine-Figure21
그림 21

내용

주의 사항

① Current temperature inside the test chamber.

② Current saturated drum temperature.

③ Current program number

Click to select the program you want to run.

④ The number of the currently running segment

Each program has many test segments, and the segment number currently being executed is displayed.

⑤ Current runtime.

⑥ Water Level Display

Water level display for the laboratory (test chamber), saturation tank, and brine tank.

⑦ Maintain

If you press this key while the program is running, the test chamber will continue to run the current test segment.

⑧ Line Break

During program execution, pressing this key will cause the test chamber to skip directly to the next section for testing.

⑨ Run

Click to run the program; click again to pause or stop it.

⑩Settings

Go to the program settings screen.

11개의 곡선

Click to view or export historical test curves.

12 Spray Defogging Mode

Displays the current spray and defogging statuses.

4.3.2 Introduction to the Program Settings Screen

To access the program settings screen:

Salt Spray Test Machine-Figure22
그림 22

내용

주의 사항

① Program Number

Set the current program number, ensuring it does not conflict with existing program numbers.

② Edit the name of the current program.

③ Number of cycles

If you do not want to loop, set it to 1.

④ Program Linking

If you want this program to automatically run another program once it finishes, enter the corresponding program number. If not, enter 0.

⑤ The segment number contained in the current program.

⑥ Set the temperature of the test chamber for the corresponding test section.

⑦ Set the saturation tank temperature for the corresponding test section.

⑧ Set the test duration for the corresponding test section.

⑨ Spray Switch

If spraying is required for this test section, switch the setting to ON.

⑩ Defog Switch

If defogging is required for this test section, switch it to ON.

11 Move to the settings screen for the 4 segments before or after, in groups of 4 segments.

Note: You must enable “Spray When Temperature Is Reached” in “Operation Settings.”

For the same temperature setting, you need to configure two adjacent test segments. The first segment is a transition segment, which should be set to 1 minute (it may actually take longer than one minute; the test chamber has a wait function that automatically advances to the next segment as soon as the set temperature is reached at the fastest possible speed). The second segment is the actual test duration.

If “End Defogging” is selected in “Operation Settings,” the defogging function does not need to be enabled for any test segments in the program. If “End Defogging” is not selected in “Operation Settings,” the final segment of the program can be set to defogging.

4.4 Monitoring the Test Process

4.4.1 온도 모니터링

Monitor the temperature of the test chamber and the saturated bucket displayed on the touchscreen in real time. The temperature will rise slowly to the target temperature; once it stabilizes, fluctuations should not exceed ±1°C. If the temperature is abnormal, stop operation and refer to Chapter 6 for troubleshooting.

4.4.2 수위 모니터링

Check the water levels in the laboratory (test chamber), saturation tank, and brine tank regularly. You may monitor them based on the following guidelines:

The water inside the test chamber is not consumed, so low-water-level alarms rarely occur under normal circumstances, unless the test chamber is vibrating or shaking;

The water in the saturation tank is used to pressurize the spray system and will be consumed; please refill the tank as described in Section 3.3.2. If you need to add water manually, tap the touchscreen to pause the test. After adding water, tap to resume the test. If automatic water replenishment is enabled, the test will automatically pause when the water level in the saturation tank drops to the “L” low-water alarm level. The system will then automatically replenish the water, and the test will resume automatically upon completion without requiring manual intervention;

The brine in the brine tank is used for the spray test and will be consumed; please replenish the brine as described in Section 3.4.2.

4.4.3 Spray Monitoring

Observe the spray pattern through the glass door of the mist chamber to ensure that the spray is uniform and uninterrupted. If any abnormalities are detected (such as a decrease in spray volume or water dripping from the nozzle), pause the test to check whether the nozzle is clogged or if the air pressure is stable.

4.4.4 데이터 기록

Record the test duration, mist chamber temperature, saturation chamber temperature, brine level, and spray status every 2 to 4 hours; you can also export all historical data after the test is complete.

4.5 End of the Test and Shutdown

4.5.1 Stopping Spraying and Defogging

Timed End: If a test duration has been set, the equipment will automatically stop spraying when the time elapses and enter the defogging mode (when “End Defogging” is enabled). Once defogging is complete, the touchscreen will display “Test Complete.”

Manual Stop: If you need to stop the test early, tap the “Stop” button on the touchscreen. The equipment will stop spraying. You can choose whether to activate the defogging function (tap the “Manual Defogging” button). Once the salt fog has been expelled from the chamber, turn off the “Manual Defogging” button before proceeding with subsequent operations.

4.5.2 Data Organization and Sample Retrieval

Data Organization: Record the total test duration, actual temperature curves, and any anomalies (such as mid-test water replenishment or alarms); export and save historical data (if available); and organize the test record forms.

Removing the Sample: After the defogging process is complete, let the sample sit for 5 minutes. Wear acid- and alkali-resistant gloves, open the chamber door, and carefully remove the sample (taking care to prevent salt deposits from falling off the sample’s surface). Place the sample on a clean tray and label it with the relevant information (such as the test number and test duration).

4.5.3 Equipment Shutdown

Turn off the air compressor or disconnect the air intake hose, and turn off the power to the test chamber.

5. 테스트 후 처리

5.1 샘플 준비

5.1.1 Sample Cleaning and Drying

Cleaning: In accordance with the test standard requirements, gently rinse the sample surface with purified water (or distilled water) at a temperature of ≤38°C to remove residual salt deposits. Avoid vigorous rinsing, which could damage the sample’s corrosion products (such as rust layers or oxidation layers); If permitted by the standard, a small amount of neutral detergent (such as dish soap) may be applied to remove stubborn salt deposits, followed by thorough rinsing with purified water.

Drying: After washing, use clean, degreased cotton or filter paper to blot the moisture from the sample’s surface, or place the sample in a ventilated drying cabinet at room temperature (without heat) to air-dry. Avoid direct sunlight or high-temperature drying to prevent changes in the sample’s surface condition.

5.1.2 샘플 평가

Visual Inspection: Examine the sample surface for signs of rust, discoloration, coating peeling, blistering, etc. Record the area affected by corrosion and the severity of corrosion (e.g., mild, moderate, severe). Take photographs for future comparison.

Performance Testing: Depending on the objectives of the test, conduct follow-up performance tests on the samples (such as adhesion testing, impact resistance testing, and electrical performance testing) to evaluate the impact of salt spray corrosion on the samples’ performance, and compile an evaluation report.

5.2 장비 청소

5.2.1 Cleaning the Fog Chamber

Rinse the inner walls of the mist chamber, the spray tower, the mist collector, and the mesh partitions with purified water to remove residual salt deposits and scale. For stubborn stains, gently scrub with a soft-bristled brush dipped in a neutral detergent, then rinse thoroughly with purified water.

Clean the temperature probe and the surface of the heating tube: Wipe the temperature probe with a soft cloth to remove any salt spray buildup; if there is scale on the surface of the heating tube, soak it in a citric acid solution (5% concentration) for 10–15 minutes, then rinse with clean water. Avoid scraping the heating tube with hard objects(to prevent damage to the coating).

5.2.2 Cleaning the Saturation Tank

Open the drain valve on the saturation tank (located at the bottom of the test chamber), drain out any remaining water, close the drain valve, then fill the tank with a 5% citric acid solution and let it soak for 20–30 minutes (to remove scale from the inner walls of the tank). Next, drain the solution and rinse the tank 2–3 times with purified water to ensure no citric acid residue remains.

Cleaning the saturated tank liquid level sensor: Use a soft cloth dipped in purified water to wipe the sensor probe, removing any scale buildup to ensure accurate liquid level detection.

5.2.3 Cleaning the Brine Tank and Nozzles

Brine Tank: Rinse the inside walls of the tank with purified water to remove any residual brine and sediment. If there are salt crystals, soak the tank in warm water, then scrub them off. After rinsing thoroughly, let the tank air dry.

Nozzle Cleaning: Remove the nozzle and gently clear the small holes in the nozzle with a thin copper wire (diameter ≤ 0.5 mm), taking care not to apply excessive force that could damage the nozzle; Soak the nozzle in a 5% citric acid solution for 15 minutes to remove scale, then rinse thoroughly with purified water, let it air dry, and reinstall it (ensuring the small hole in the glass tube is properly aligned); If the nozzle is cracked, the orifice is deformed, or it fails to spray properly even after cleaning, replace it with a spare nozzle.

5.3 장기 보관 요건

5.3.1 보관 전 준비 사항

If the equipment will not be used for an extended period (more than 1 month), take the following steps:

Turn Off Power and Air Supply: Disconnect the equipment from the power source, unplug the air hose from the air compressor, and turn off the air compressor’s power;

Thoroughly clean the equipment: Follow the steps in “5.2 Equipment Cleaning” to clean the fog chamber, saturation tank, salt water tank, and nozzles, ensuring no salt residue remains;

Drain all liquids: Open the drain valve to remove any residual water from the components, and use compressed air to dry the interior (to prevent moisture and rust);

Protecting Components: Cover the equipment with a dust cover to prevent dust from entering.

5.3.2 Maintenance During Storage

Storage conditions must meet the requirements specified in Section 2.3.1;

Power on once a month: Turn on the power to the equipment and let it run for 30 minutes (without adding water or brine) to prevent electrical components (such as capacitors and contactors) from deteriorating;

Inspect once a month: Open the dust cover and check the interior of the equipment for rust or mold; if any is found, clean and dry it immediately. Check the hoses for signs of aging and ensure the connections are secure.

6. 일반적인 문제 해결

If the device malfunctions, please refer to the following common problems and solutions:

일반적인 문제

가능한 원인들

순서

Fog Chamber / Saturation Tank Not Heating

1. Insufficient liquid level; 2. Burnt-out heating element; 3. Faulty temperature controller; 4. Damaged temperature sensor

1. Top off the fluid until the level indicator turns green; 2. Turn off the power and check the resistance of the heating element (which should normally be several tens of ohms); if it is burned out, replace it; 3. Restart the unit; if it still does not respond, contact customer service to have the controller repaired; 4. Check the probe wiring; if damaged, replace it.

스프레이 없음

1. Insufficient brine; 2. Clogged nozzle; 3. Air leak (e.g., disconnected air hose, damaged solenoid valve); 4. Improper air pressure adjustment

1. Refill with saline solution; 2. Clean the nozzle (see 5.2.3); 3. Check the air hose connections and replace any damaged solenoid valves; 4. Readjust the air pressure (0.2 MPa at the back, 1 kg/cm² at the front)

The temperature cannot reach the set point

1. Insufficient heating element power; 2. Liquid level sensor malfunction (abnormal liquid level display); 3. Ambient temperature is too low; 4. Poor door seal

1. Check the heating element’s wattage and replace it with a compatible one; 2. Clean or replace the liquid level sensor; 3. Adjust the ambient temperature (e.g., turn up the heat); 4. Check the water level in the sealing tank and top it off to the standard level

No change in temperature

1. The equipment is vibrating; 2. Momentary fluctuations in temperature readings have triggered the protective mechanism.

1. The equipment must be in a stable state during operation; 2. Stop the test, let it sit for about 1 minute, and then restart the test.

The front pressure gauge cannot be adjusted to a higher reading

1. The manual water fill valve on the pressure tank is not closed; 2. The nozzle air hose has come loose or is cracked; 3. The spray solenoid valve is damaged

1. Close the manual water fill valve; 2. Replace or reconnect the air hose; 3. Replace the solenoid valve

부록 및 다운로드